Feeds:
Posts
Comments

Archive for June, 2010

Read Full Post »

Paining the chimney. Painting the sun porch door.

Read Full Post »

  Changing out the power box leading to the HVAC, putting new moulding in Frank’s office and painting the garage door. Pressure washing the sun porch as part of washing the whole house. Painting the chimney.      Replacing boards and painting the sun porch.

Read Full Post »

The morning on Tuesday was spent correcting the problem introduced with a flag pole holder placed by the first owners a decade and a half ago. It led to rot in the LP siding, which led to our morning of working on replacing the boards and flashing over the garage door as we dealt with [...]

Read Full Post »

      We resided the part of the house in front of Frank’s office. Once the paint was on, it looked like rain and we covered it with plastic, but there has been no rain since the paint went on. We also began repainting Griffin’s old bedroom/Frank’s current office.            

Read Full Post »

More Makeover

Residing and repainting the house.

Read Full Post »

With our work at King of Peace finished (see earlier post below), we are turning our attention to getting our house in St. Marys ready to list with a real estate agent. This means painting to more conventional colors are staging the house to be move in ready. Here is the living room as transformed. [...]

Read Full Post »

Special youth/children music on the final Sunday The last entry in the parish register, the 108th and 109th baptisms recorded. June 13, was our final Sunday at King of Peace. It was a big full morning concluded with a covered dish, a wonderful send-off from the church we arrived here to found. They are now [...]

Read Full Post »

Follow

Get every new post delivered to your Inbox.