Finishing Touches

 
On Monday, we finished our big renovation project in a 12-hour work day which included grouting the shower surround (work, but easy) and changing out Griffin’s bathroom faucet (easy, but turned into a big 2-hour ordeal when a pipe broke off in the wall. It’s all done and we both used the shower today. It [...]

Read Full Post »

Continuing work on the bathroom, we got the main tile and trim tile in place. Once this all dries, we can then add the trim work between the tub and the surround and the soap holder, shelves and towel rack and finally grout. The end of the project is in sight.

Read Full Post »

Break Over, Back to Work

After a week-long break to lead a Vacation Bible School we got back into the bathroom today to put up 30 square feet of tile. That’s the whole back wall and just under half of the tile needed for the shower surround. It was also a good start back to work after a break. The [...]

Read Full Post »

Kids in the Kingdom Week

From a week of usual work combined with renovating our home (see below) we moved into an exhausting, but highly gratifying week of Vacation Bible School. The week is going great thanks to the crew of volunteers working to make it all happen and some good kids besides.
The photos of all the high energy fun [...]

Read Full Post »

Work Weekend Worked

We had church work and meetings to do and a LOT of progress to make on this house this past weekend and it all came together. Like a looming deadline on a home renovation show, we faced Griffin coming home today from her grandmother’s and we wanted to have the house as back to normal [...]

Read Full Post »

Priest Hugs Toilet

If I had called it “installing the toilet” no one could have Googled the odd phrase above and found an Episcopal priest hugging the toilet as a part of getting a good seal on the wax ring for installation.
Victoria also added some tile just outside the tub. We are doing this strip outside the [...]

Read Full Post »

Small Steps

Thursday was not the biggest day for us in terms of what got accomplished, as we are also geting ready for the church’s Vacation Bible School next week and doing usual work too. But we did get the DensGuard tile backer around the shower and started enough laminate on the floor to get a [...]

Read Full Post »

Water Flowing Again

 
On Tuesday night, we cut off the water to the house to install the new water pipes for the bath and shower. The whole 15-joint sculpture we created held water everywhere except in the last joint, where a pinhole leak sprayed water. By then it was midnight and everything had to wait until 7 [...]

Read Full Post »

Sweating the Pipes

Sweating copper pipes is the term for soldering them together and we have been soldering away on rebuilding the piping behind the wall in the bath/shower so that we can attach the new fixtures we bought.

Read Full Post »

Progress

Picking out a new toilet

Victoria removes the carpet tack strips in the bedroom, which comes next.

First coat of paint in the bathroom.

New sink and faucets in the bathroom.

Read Full Post »

…having your toilet and bathtub out on the curb. We are remodeling our “master” bedroom and bath by redoing the floors, repainting and/or tiling the walls as appropriate and replacing the tub, toilet, sinks and fixtures. Other than that, we aren’t doing much.